Is this joint ready for the approved seal method, or should I fix the fit first

At [location], I'm checking is this joint ready for the approved seal method, or should i fix the fit first. I stopped at the unclear point. What do you want me to verify or change before I continue?

At [location], I'm working on Sealing, Leakage, Mastic & Pressure Testing. I checked the visible condition and the approved information I have. The unresolved issue is: Is this joint ready for the approved seal method, or should I fix the fit first. What decision do you want me to follow before I continue?

Sealing, Leakage, Mastic & Pressure Testing 3rd Year YELLOW

Stop if

Watch out

Check

Say this to your foreman

803 is this joint ready for the approved seal method, or should i fix the fit first sealing, leakage, mastic & pressure testing at [location], i'm checking is this joint ready for the approved seal method, or should i fix the fit first. i stopped at the unclear point. what do you want me to verify or change before i continue? 3rd year / coordination