Foreman script

Verify first

Verify before you commit. Cheap to catch now.

Is this connection fit clean enough to seal, or should I adjust it first

At [location], I'm checking is this connection fit clean enough to seal, or should i adjust it first. I stopped at the unclear point. What do you want me to verify or change before I continue?

At [location], I'm working on Equipment Connections: RTU, AHU, VAV. I checked the visible condition and the approved information I have. The unresolved issue is: Is this connection fit clean enough to seal, or should I adjust it first. What decision do you want me to follow before I continue?

Equipment Connections: RTU, AHU, VAV, Fans & Louvers 3rd Year YELLOW

Stop if

Watch out

Check

Say this to your foreman

293 is this connection fit clean enough to seal, or should i adjust it first equipment connections: rtu, ahu, vav at [location], i'm checking is this connection fit clean enough to seal, or should i adjust it first. i stopped at the unclear point. what do you want me to verify or change before i continue? 3rd year / systems coordination

More in Equipment Connections: RTU, AHU, VAV, Fans & Louvers