Field problem
Verify first
Verify before you commit. Cheap to catch now.
Take the duct weight off the flange joint before assembly. Both sections need temporary or permanent support so the gasket and flange faces meet level, square, and evenly.
In Rectangular Duct Assembly: TDC / Ductmate / Flanges, I'm looking at: Installing flange joint with unsupported duct weight hanging on it. What should I verify before I cut, drill, seal, cover, move, or install?