Tell someone or document it before you close it up.
Installer takes blame for design conflict because no documentation
If you are already being blamed for an undocumented design conflict, reconstruct the timeline and bring evidence to your foreman/PM before accepting blame or touching rework.
I'm being asked about this rework. I have photos/texts and the drawing history from when it was installed. Can we review the timeline before I start removing anything?
Watch out
Do not argue, delete messages, or start rework before the scope/responsibility is clear.
Check
Pull photos, texts, notes, and drawing revisions from the time of install.
Write a simple timeline: date, location, direction, who gave it, what changed.
Identify what was installed and what was based on verbal direction/design conflict.
Bring the package to your foreman first.
Do not remove work until scope and responsibility are clarified.
Steps
Pull photos, texts, notes, and drawing revisions from the time of install.
Write a simple timeline: date, location, direction, who gave it, what changed.
Identify what was installed and what was based on verbal direction/design conflict.
Bring the package to your foreman first.
Do not remove work until scope and responsibility are clarified.
Say this to your foreman
I'm being asked about this rework. I have photos/texts and the drawing history from when it was installed. Can we review the timeline before I start removing anything?