Apprentice question
Stop and ask
Stop. Get direction before you touch it.
1. Lower the equipment safely down to the concrete floor pad right outside the room door threshold using a fork lift or gantry frame. 2. Place heavy-duty steel rolling machine skates uniformly under the four primary corner load points of the unit framework casing. 3. Use a heavy pry bar (pinch bar) to gently steer and roll the unit along the smooth floor surface into its final footprint location. 4. Jack the unit up slightly, swap out the rolling skates for permanent neoprene vibration isola
['1. Lower the equipment safely down to the concrete floor pad right outside the room door threshold using a fork lift or gantry frame. 2. Place heavy-duty steel rolling machine skates uniformly under the four primary corner load points of the unit framework casing. 3. Use a heavy pry bar (pinch bar) to gently steer and roll the unit along the smooth floor surface into its final footprint location. 4. Jack the unit up slightly, swap out the rolling skates for permanent neoprene vibration isolator pads, and drop it smoothly onto its final level alignment line.']
how do i set a split-system air handler in a tight mechanical room using machine skates?
More in Equipment Connections: RTU, AHU, VAV, Fans & Louvers