Leave a clear gap of roughly 2 to 3 inches between the raw metal edges of the equipment discharge and your main trunk line. Wrap and secure the canvas connector fabric across this gap without pulling it tight like a drum string. It needs enough slack to absorb the mechanical kick when the fan starts up without tearing or transferring vibration down the line.
['Leave a clear gap of roughly 2 to 3 inches between the raw metal edges of the equipment discharge and your main trunk line. Wrap and secure the canvas connector fabric across this gap without pulling it tight like a drum string. It needs enough slack to absorb the mechanical kick when the fan starts up without tearing or transferring vibration down the line.']
how do i install a flexible connection (canvas connector) at the equipment discharge?