Foreman script
Verify first
Verify before you commit. Cheap to catch now.
Boss, I'm at this rectangular duct joint. I'm seeing flange joint with unsupported duct weight hanging on it. Do you want me to document it before we continue?
Boss, I'm at this rectangular duct joint. I checked the field condition and this may affect access, coordination, TAB, equipment, or the next trade. I'm seeing flange joint with unsupported duct weight hanging on it. Do you want this held, documented, or coordinated before we keep going?
123 flange joint with unsupported duct weight hanging on it rectangular duct assembly: tdc / ductmate yellow 3 boss, i'm at this rectangular duct joint. i'm seeing flange joint with unsupported duct weight hanging on it. do you want me to document it before we continue? boss, i'm at this rectangular duct joint. i checked the field condition and this may affect access, coordination, tab, equipment, or the next trade. i'm seeing flange joint with unsupported duct weight hanging on it. do you want this held, documented, or coordinated before we keep going? coordination/system issue: flange joint with unsupported duct weight hanging on it. i have photos, location, and what is blocked or affected.