Field problem
Verify first
Verify before you commit. Cheap to catch now.
Confirm the connector and duct size match before the section is lifted. The flange should sit on the duct correctly, the corner holes should come close without forcing, and the finished duct-not just the corners-must line up level and square.
In Rectangular Duct Assembly: TDC / Ductmate / Flanges, I'm looking at: Ductmate/TDC connector matches duct size not checked. What should I verify before I cut, drill, seal, cover, move, or install?