Duct staged in wrong zone/floor
If duct is staged in the wrong zone or floor, stop mixing material and relabel before pieces disappear into the wrong run.
Stop if
- This material looks staged for the wrong floor/zone. Where do you want it moved or relabeled?
Watch out
- Do not install from a mixed pile because the size looks right.
Check
- Check piece marks and area/floor tags.
- Separate wrong-zone material.
- Tell foreman what moved where.
- Relabel if directed.
- Do not install until the piece belongs to that area.
Steps
- Check piece marks and area/floor tags.
- Separate wrong-zone material.
- Tell foreman what moved where.
- Relabel if directed.
- Do not install until the piece belongs to that area.
Say this to your foreman
This material looks staged for the wrong floor/zone. Where do you want it moved or relabeled?
More in Coordination, Clashes, Sequencing & Rework