Duct elevation with sprinkler or cable tray not coordinated
Coordinate duct elevation against sprinkler, cable tray, lights, ceiling, and structure before hanging.
Stop if
- This elevation conflicts with another trade. Which elevation/route controls?
Watch out
- Do not raise/lower duct on your own to dodge another trade.
Check
- Check latest mechanical elevation.
- Compare with sprinkler/cable tray/lighting/ceiling drawings or field install.
- Look for clash notes/RFIs.
- Mark conflicts before duct is loaded.
- Ask before moving elevation.
Steps
- Check latest mechanical elevation.
- Compare with sprinkler/cable tray/lighting/ceiling drawings or field install.
- Look for clash notes/RFIs.
- Mark conflicts before duct is loaded.
- Ask before moving elevation.
Say this to your foreman
This elevation conflicts with another trade. Which elevation/route controls?
More in Print Reading, Tags & Layout