Duct Cleanliness at Closeout
Leave the system free of construction debris, standing water, loose liner, labels, screws, and temporary materials before startup and turnover.
Stop if
- Before this system is released for startup, what cleanliness inspection and documentation does the project require?
Watch out
- Do not blow debris deeper into the system, leave cleaning rags inside, or remove protection before surrounding construction is ready.
Check
- Inspect accessible interiors and openings
- Retrieve cookies, screws, and packaging
- Remove temporary caps only in the approved sequence
- Check liner and sealant debris
- Document cleaning and protected status
Steps
- Inspect accessible interiors and openings
- Retrieve cookies, screws, and packaging
- Remove temporary caps only in the approved sequence
- Check liner and sealant debris
- Document cleaning and protected status
Say this to your foreman
Before this system is released for startup, what cleanliness inspection and documentation does the project require?