Foreman script

Verify first

Verify before you commit. Cheap to catch now.

Does this damper need better access before cover

Boss, I'm at this damper/rated assembly. This is red-zone: does this damper need better access before cover. Do you want me to hold it until the approved detail is verified?

Boss, I'm at this damper/rated assembly. This involves does this damper need better access before cover. I'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it.

Airflow, Noise, Vibration & TAB 4th Year YELLOW

Stop if

Watch out

Check

Say this to your foreman

440 does this damper need better access before cover airflow/tab impacts from installation yellow 4 boss, i'm at this damper/rated assembly. this is red-zone: does this damper need better access before cover. do you want me to hold it until the approved detail is verified? boss, i'm at this damper/rated assembly. this involves does this damper need better access before cover. i'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it. red-zone item: does this damper need better access before cover. i have the location, photo, and drawing/detail ready. who needs to verify before work continues?

More in Airflow, Noise, Vibration & TAB