Document Seismic Bracing Before It Is Covered
Capture brace location, direction, angle, attachment, hardware, labels, and surrounding clearance while the complete installation is still visible.
Stop if
- Which seismic brace locations and attachment details need photos or inspection signoff before this ceiling or shaft closes?
Watch out
- Do not take one distant photo, hide unapproved changes, or cover attachments before required inspection.
Check
- Use the approved brace plan as the photo list
- Photograph both duct and structural ends
- Include identifying grid/area without private data
- Capture hardware and installation labels
- Record deviations and approval before cover
Steps
- Use the approved brace plan as the photo list
- Photograph both duct and structural ends
- Include identifying grid/area without private data
- Capture hardware and installation labels
- Record deviations and approval before cover
Say this to your foreman
Which seismic brace locations and attachment details need photos or inspection signoff before this ceiling or shaft closes?