Foreman script

Verify first

Verify before you commit. Cheap to catch now.

Do you want this vav connection adjusted for access or support before final

At [location], I'm checking do you want this vav connection adjusted for access or support before final. I stopped at the unclear point. What do you want me to verify or change before I continue?

At [location], I'm working on Equipment Connections: RTU, AHU, VAV. I checked the visible condition and the approved information I have. The unresolved issue is: Do you want this vav connection adjusted for access or support before final. What decision do you want me to follow before I continue?

Equipment Connections: RTU, AHU, VAV, Fans & Louvers 3rd Year YELLOW

Watch out

Check

Say this to your foreman

292 do you want this vav connection adjusted for access or support before final equipment connections: rtu, ahu, vav at [location], i'm checking do you want this vav connection adjusted for access or support before final. i stopped at the unclear point. what do you want me to verify or change before i continue? 3rd year / systems coordination

Coordination/system issue: Do you want this vav connection adjusted for access or support before final. I have photos, location, and what is blocked or affected.

More in Equipment Connections: RTU, AHU, VAV, Fans & Louvers