Condensate Coordination at HVAC Equipment
Protect the drain connection, required slope, trap, cleanout, insulation, and service access while routing duct and supports around equipment.
Stop if
- The condensate route needs [direction/slope]. Can we lock the drain and service space before I finalize this duct and support layout?
Watch out
- Do not crowd the drain connection, block trap removal, or force gravity piping to dodge a duct route after the equipment is set.
Check
- Identify drain connection and direction
- Confirm trap and slope space
- Keep duct supports out of the piping route
- Allow cleanout and pan access
- Coordinate insulation and ceiling access
Steps
- Identify drain connection and direction
- Confirm trap and slope space
- Keep duct supports out of the piping route
- Allow cleanout and pan access
- Coordinate insulation and ceiling access
Say this to your foreman
The condensate route needs [direction/slope]. Can we lock the drain and service space before I finalize this duct and support layout?
More in Coordination, Clashes, Sequencing & Rework