Foreman script
Stop and ask
Stop. Get direction before you touch it.
Boss, I'm at this exhaust run. This is red-zone: cleanout spacing not coordinated before install. Do you want me to hold it until the approved detail is verified?
Boss, I'm at this exhaust run. This involves cleanout spacing not coordinated before install. I'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it.
265 cleanout spacing not coordinated before install grease / special exhaust red 4 boss, i'm at this exhaust run. this is red-zone: cleanout spacing not coordinated before install. do you want me to hold it until the approved detail is verified? boss, i'm at this exhaust run. this involves cleanout spacing not coordinated before install. i'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it. red-zone item: cleanout spacing not coordinated before install. i have the location, photo, and drawing/detail ready. who needs to verify before work continues?