Foreman script
Stop and ask
Stop. Get direction before you touch it.
Boss, I'm at this exhaust run. This is red-zone: cleanout/access requirements. Do you want me to hold it until the approved detail is verified?
Boss, I'm at this exhaust run. This involves cleanout/access requirements. I'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it.
253 cleanout/access requirements grease / special exhaust red 4 boss, i'm at this exhaust run. this is red-zone: cleanout/access requirements. do you want me to hold it until the approved detail is verified? boss, i'm at this exhaust run. this involves cleanout/access requirements. i'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it. red-zone item: cleanout/access requirements. i have the location, photo, and drawing/detail ready. who needs to verify before work continues?