Foreman script
Stop and ask
Stop. Get direction before you touch it.
Boss, I'm at this damper/rated assembly. This is red-zone: checking blade swing before fastening duct. Do you want me to hold it until the approved detail is verified?
Boss, I'm at this damper/rated assembly. This involves checking blade swing before fastening duct. I'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it.
730 checking blade swing before fastening duct dampers / rated work red 4 boss, i'm at this damper/rated assembly. this is red-zone: checking blade swing before fastening duct. do you want me to hold it until the approved detail is verified? boss, i'm at this damper/rated assembly. this involves checking blade swing before fastening duct. i'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it. red-zone item: checking blade swing before fastening duct. i have the location, photo, and drawing/detail ready. who needs to verify before work continues?