Ceiling grid coordination before turnover not checked
Turnover starts while the work is still open. Capture changes, holds, access issues, and installed status before everyone forgets.
Stop if
- Does this need a redline/as-built note before we move on?
Watch out
- Do not wait until the end of the job to remember field changes.
Check
- Mark what changed from the drawing.
- Save photos/notes by room/grid/system.
- Track open items and holds.
- Confirm required labels/access are complete.
- Ask if an as-built/redline note is needed.
Steps
- Mark what changed from the drawing.
- Save photos/notes by room/grid/system.
- Track open items and holds.
- Confirm required labels/access are complete.
- Ask if an as-built/redline note is needed.
Say this to your foreman
Does this need a redline/as-built note before we move on?