Ceiling Grid and T-Bar Awareness
Is this grid layout final, and should I set this air device by the RCP, the tile center, or the foreman layout marks?
I'm checking finish work for ceiling grid and t-bar awareness. I have the room/grid, photo, tag, and measurement ready. Is this grid layout final, and should I set this air device by the RCP, the tile center, or the foreman layout marks?
Stop if
- Finish work red-zone check: Ceiling Grid and T-Bar Awareness. I have location, photos, drawings/details, and the access/inspection concern ready. Who verifies before this gets covered or turned over?
Watch out
- Stop if the grid is not final, a ceiling conflict exists, or the device would block access to another trade's required component.
Check
- room/grid/area
- photo wide and close
- device tag or drawing note
- measurement/control point
- access/inspection concern