Apprentice question
Stop and ask
Stop. Get direction before you touch it.
A column in a return duct path is not an apprentice-level field modification. Stop, measure the conflict, protect the opening, and get an approved detail before building around structural concrete or steel.
['A return duct running into a fixed structural column is a coordination/design issue. Sometimes the recovery may involve rerouting, splitting the duct, enlarging the duct around the obstruction, or building an approved internal shroud, but that decision belongs to the foreman/detailer/engineer.', 'The apprentice value is to gather clean field information: exact location, duct size, column size, available space on each side, airflow direction, access, and what is downstream. Do not cut, notch, flatten, or freestyle a duct-around-column solution.']