Foreman script

Stop and ask

Stop. Get direction before you touch it.

Bracing installed before final alignment and then fights run

Boss, I'm at this brace/structural location. This is red-zone: bracing installed before final alignment and then fights run. Do you want me to hold it until the approved detail is verified?

Boss, I'm at this brace/structural location. This involves bracing installed before final alignment and then fights run. I'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it.

Seismic Bracing & Structural Coordination 4th Year RED

Stop if

Watch out

Check

Say this to your foreman

224 bracing installed before final alignment and then fights run seismic / structure red 4 boss, i'm at this brace/structural location. this is red-zone: bracing installed before final alignment and then fights run. do you want me to hold it until the approved detail is verified? boss, i'm at this brace/structural location. this involves bracing installed before final alignment and then fights run. i'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it. red-zone item: bracing installed before final alignment and then fights run. i have the location, photo, and drawing/detail ready. who needs to verify before work continues?