Foreman script
Stop and ask
Stop. Get direction before you touch it.
Boss, I'm at this brace/structural location. This is red-zone: bracing installed after duct is already misaligned. Do you want me to hold it until the approved detail is verified?
Boss, I'm at this brace/structural location. This involves bracing installed after duct is already misaligned. I'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it.
704 bracing installed after duct is already misaligned seismic / structure red 4 boss, i'm at this brace/structural location. this is red-zone: bracing installed after duct is already misaligned. do you want me to hold it until the approved detail is verified? boss, i'm at this brace/structural location. this involves bracing installed after duct is already misaligned. i'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it. red-zone item: bracing installed after duct is already misaligned. i have the location, photo, and drawing/detail ready. who needs to verify before work continues?