Foreman script

Stop and ask

Stop. Get direction before you touch it.

Brace placed on unsupported duct/fitting

Boss, I'm at this support location. This is red-zone: brace placed on unsupported duct/fitting. Do you want me to hold it until the approved detail is verified?

Boss, I'm at this support location. This involves brace placed on unsupported duct/fitting. I'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it.

Seismic Bracing & Structural Coordination 4th Year RED

Stop if

Watch out

Check

Say this to your foreman

212 brace placed on unsupported duct/fitting seismic / structure red 4 boss, i'm at this support location. this is red-zone: brace placed on unsupported duct/fitting. do you want me to hold it until the approved detail is verified? boss, i'm at this support location. this involves brace placed on unsupported duct/fitting. i'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it. red-zone item: brace placed on unsupported duct/fitting. i have the location, photo, and drawing/detail ready. who needs to verify before work continues?

More in Seismic Bracing & Structural Coordination