Foreman script
Stop and ask
Stop. Get direction before you touch it.
Boss, I'm at this brace/structural location. This is red-zone: brace interferes with ceiling grid or lighting. Do you want me to hold it until the approved detail is verified?
Boss, I'm at this brace/structural location. This involves brace interferes with ceiling grid or lighting. I'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it.
217 brace interferes with ceiling grid or lighting seismic / structure red 4 boss, i'm at this brace/structural location. this is red-zone: brace interferes with ceiling grid or lighting. do you want me to hold it until the approved detail is verified? boss, i'm at this brace/structural location. this involves brace interferes with ceiling grid or lighting. i'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it. red-zone item: brace interferes with ceiling grid or lighting. i have the location, photo, and drawing/detail ready. who needs to verify before work continues?