Foreman script

Stop and ask

Stop. Get direction before you touch it.

Brace installed after insulation makes inspection hard

Boss, I'm at this brace/structural location. This is red-zone: brace installed after insulation makes inspection hard. Do you want me to hold it until the approved detail is verified?

Boss, I'm at this brace/structural location. This involves brace installed after insulation makes inspection hard. I'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it.

Seismic Bracing & Structural Coordination 4th Year RED

Stop if

Watch out

Check

Say this to your foreman

209 brace installed after insulation makes inspection hard seismic / structure red 4 boss, i'm at this brace/structural location. this is red-zone: brace installed after insulation makes inspection hard. do you want me to hold it until the approved detail is verified? boss, i'm at this brace/structural location. this involves brace installed after insulation makes inspection hard. i'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it. red-zone item: brace installed after insulation makes inspection hard. i have the location, photo, and drawing/detail ready. who needs to verify before work continues?

More in Seismic Bracing & Structural Coordination