Foreman script

Stop and ask

Stop. Get direction before you touch it.

Brace direction for lateral load

Boss, I'm at this brace/structural location. This is red-zone: brace direction for lateral load. Do you want me to hold it until the approved detail is verified?

Boss, I'm at this brace/structural location. This involves brace direction for lateral load. I'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it.

Seismic Bracing & Structural Coordination 4th Year RED

Stop if

Watch out

Check

Say this to your foreman

705 brace direction for lateral load seismic / structure red 4 boss, i'm at this brace/structural location. this is red-zone: brace direction for lateral load. do you want me to hold it until the approved detail is verified? boss, i'm at this brace/structural location. this involves brace direction for lateral load. i'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it. red-zone item: brace direction for lateral load. i have the location, photo, and drawing/detail ready. who needs to verify before work continues?

More in Seismic Bracing & Structural Coordination