Foreman script
Verify first
Verify before you commit. Cheap to catch now.
Where does TAB want the test port, and what plug/label do we use after the reading?
I'm checking balancing port location and plugs at [location]. I found: Holes are drilled in bad locations, left open, or covered by insulation without plugs.. Where does TAB want the test port, and what plug/label do we use after the reading?
14619 balancing port location and plugs airflow, noise, vibration & tab impacts yellow 2nd where does tab want the test port, and what plug/label do we use after the reading? test port, static pressure hole, pitot hole, tab plug, pressure tap holes are drilled in bad locations, left open, or covered by insulation without plugs.