Test ports need to be placed where TAB can actually read pressure or airflow, then plugged and sealed after use.
Stop if
- Where does TAB want the test port, and what plug/label do we use after the reading?
Watch out
- Do not randomly drill test holes. Do not leave open holes. Do not cover ports before TAB is done.
Check
- TAB requested location, straight duct distance if required, access after ceiling, plug type, and insulation patch plan.
Steps
- TAB requested location, straight duct distance if required, access after ceiling, plug type, and insulation patch plan.
Say this to your foreman
Where does TAB want the test port, and what plug/label do we use after the reading?