Foreman script
Verify first
Verify before you commit. Cheap to catch now.
Does this field change need a redline/as-built note?
I'm checking as-built measurement note. I measured the field condition and want to verify the reference point before I act. Does this field change need a redline/as-built note?
9022 as-built measurement note coordination measuring yellow 3 does this field change need a redline/as-built note? i'm checking as-built measurement note. i measured the field condition and want to verify the reference point before i act. does this field change need a redline/as-built note? measurement question: as-built measurement note. i have the location, photo, and measured reference point ready. who should verify before this becomes cut, ordered, drilled, or covered?