As-built change not documented
Mark field changes while the work is still fresh. Redlines/as-builts are not a memory test at the end of the job.
Stop if
- Does this field change need a redline/as-built note before we move on?
Watch out
- Do not wait until turnover to guess what changed weeks ago.
Check
- Mark what changed from the drawing.
- Include room/grid/system and direction of change.
- Attach photo/sketch if allowed.
- Confirm whether foreman/PM wants formal RFI/as-built note.
- Do not leave unclear notes for closeout.
Steps
- Mark what changed from the drawing.
- Include room/grid/system and direction of change.
- Attach photo/sketch if allowed.
- Confirm whether foreman/PM wants formal RFI/as-built note.
- Do not leave unclear notes for closeout.
Say this to your foreman
Does this field change need a redline/as-built note before we move on?
More in QA/QC, Punchlist, Documentation & Turnover