Foreman script

Stop and ask

Stop. Get direction before you touch it.

Apprentice copies brace layout without understanding load path

Boss, I'm at this brace/structural location. This is red-zone: apprentice copies brace layout without understanding load path. Do you want me to hold it until the approved detail is verified?

Boss, I'm at this brace/structural location. This involves apprentice copies brace layout without understanding load path. I'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it.

Seismic Bracing & Structural Coordination 4th Year RED

Stop if

Watch out

Check

Say this to your foreman

225 apprentice copies brace layout without understanding load path seismic / structure red 4 boss, i'm at this brace/structural location. this is red-zone: apprentice copies brace layout without understanding load path. do you want me to hold it until the approved detail is verified? boss, i'm at this brace/structural location. this involves apprentice copies brace layout without understanding load path. i'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it. red-zone item: apprentice copies brace layout without understanding load path. i have the location, photo, and drawing/detail ready. who needs to verify before work continues?

More in Seismic Bracing & Structural Coordination