Aircraft Hangar High-Bay Duct Coordination
Aircraft hangars add high-bay work, fire protection, door clearance, and large-air-volume coordination.
Stop if
- This hangar duct is near door/crane/fire protection clearance. Do we verify clearance envelopes before hanging?
Watch out
- Do not hang below required clearance or in moving door/crane paths.
Check
- Confirm door path, crane/bridge path, fire suppression clearance, aircraft clearance envelope, and lift plan.
Steps
- Identify whether this is normal ductwork or a controlled/special condition.
- Confirm door path, crane/bridge path, fire suppression clearance, aircraft clearance envelope, and lift plan.
- Get the current drawing/detail/spec/submittal before changing routing, material, access, or support.
- Bring photos, location, and what you checked to the foreman before closing or covering the work.
Say this to your foreman
This hangar duct is near door/crane/fire protection clearance. Do we verify clearance envelopes before hanging?