Field problem

Coordinate

Tell someone or document it before you close it up.

AHU or RTU startup found an install problem. What should I document first?

Document the symptom, equipment tag, duct connection, access, vibration/noise/leak/airflow issue, and who needs to direct the fix. Do not adjust controls, wiring, gas, refrigerant, or startup settings unless qualified and directed.

Document tag, symptom, duct/access/connection condition, and scope before touching controls or equipment settings.

Equipment Connections: RTU, AHU, VAV, Fans & Louvers 3rd Year BLUE

Stop if

Watch out

Check

Steps

Say this to your foreman

Startup found [symptom] at [equipment tag/location]. I documented the duct/access/connection condition. Do you want our crew to correct anything, or should this go to startup/TAB/controls/service?

More in Equipment Connections: RTU, AHU, VAV, Fans & Louvers