Field problem

Field check

Standard work. Do it right, keep moving.

A rigid seismic brace crosses a canvas connector

Do not bridge a flexible connector with rigid bracing. Keep the duct and equipment restraint systems independent so the flex break can move.

Seismic Bracing & Structural Coordination 1st Year GREEN

Stop if

Watch out

Check

Steps

Say this to your foreman

There is a rigid brace crossing the canvas connector at [unit/location]. It is locking out the flex break. Do you want separate restraints on the duct side and equipment side?

More in Seismic Bracing & Structural Coordination