Field problem

Stop and ask

Stop. Get direction before you touch it.

A heavy duct is hung from an open-web joist bottom chord

Do not put heavy point loads on a joist chord without approved structural direction. Hold the load and move to an approved distributed support detail.

Seismic Bracing & Structural Coordination 4th Year RED

Watch out

Check

Steps

Say this to your foreman

This heavy duct/plenum is being carried by the open-web joist bottom chord at [location]. I see the steel twisting. Do you want us to hold and get an approved bridge/panel-point support detail?

More in Seismic Bracing & Structural Coordination