Field problem

Verify first

Verify before you commit. Cheap to catch now.

A duct run only has side-to-side seismic bracing

A long duct run usually needs restraint for more than one direction. Check the seismic layout and add the missing brace direction by approved detail.

Seismic Bracing & Structural Coordination 2nd Year YELLOW

Stop if

Watch out

Check

Steps

Say this to your foreman

This duct run has lateral braces but I do not see longitudinal restraint. I checked the run direction and seismic detail. Do you want longitudinal braces added before inspection?

More in Seismic Bracing & Structural Coordination