Foreman script

Stop and ask

Stop. Get direction before you touch it.

A crane pick or lift day is starting

Boss, I'm at this brace/structural location. This is red-zone: a crane pick or lift day is starting. Do you want me to hold it until the approved detail is verified?

Boss, I'm at this brace/structural location. This involves a crane pick or lift day is starting. I'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it.

Seismic Bracing & Structural Coordination 4th Year RED

Stop if

Watch out

Check

Say this to your foreman

608 a crane pick or lift day is starting seismic / structure red 4 boss, i'm at this brace/structural location. this is red-zone: a crane pick or lift day is starting. do you want me to hold it until the approved detail is verified? boss, i'm at this brace/structural location. this involves a crane pick or lift day is starting. i'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it. red-zone item: a crane pick or lift day is starting. i have the location, photo, and drawing/detail ready. who needs to verify before work continues?

More in Seismic Bracing & Structural Coordination