Field problem

Verify first

Verify before you commit. Cheap to catch now.

A 45-degree offset travel piece hits a seismic brace or cable

Do not cut, bend, or tension someone else's seismic brace. Rework your duct path or coordinate the brace conflict with the foreman.

Seismic Bracing & Structural Coordination 2nd Year YELLOW

Watch out

Check

Steps

Say this to your foreman

Our 45 offset travel piece is hitting a seismic brace at [location]. I did not touch the brace. I can adjust our elbow path or hold for coordination. What do you want?

More in Seismic Bracing & Structural Coordination