We lost power to the building, but we have 40 pieces of duct to hang. How do we shoot hanger points without laser levels
4th YearForeman Skills & Jobsite ProductivityCheck first
Go old-school. Use a traditional clear plastic water level hose line filled with water to transfer accurate, matching horizontal elevation benchmarks across the room structural columns. * To establish straight linear paths across the ceiling deck without electronic alignment beams, use a standard chalk box line anchored between two physical tape-measured coordinate points on opposite structural walls, pull it tight, and snap it to mark your anchor drilling paths.