How do I install a flexible connection (canvas connector) at the equipment discharge?
2nd YearVAVs & Fan CoilsRED · Stop / Verify
Leave a clear gap of roughly 2 to 3 inches between the raw metal edges of the equipment discharge and your main trunk line. * Wrap and secure the canvas connector fabric across this gap without pulling it tight like a drum string. It needs enough slack to absorb the mechanical kick when the fan starts up without tearing or transferring vibration down the line.
