Use two lifts for long runs if available. Strap the duct down flat to the lift forks so it cannot shift. * Use an alignment punch (drift pin) through the corner bolt holes of the existing run to guide and marry the new section perfectly into place as you slowly jack it up.

Search Field RescueOpen in Q&A search

Plain-English answer

Use two lifts for long runs if available. Strap the duct down flat to the lift forks so it cannot shift. * Use an alignment punch (drift pin) through the corner bolt holes of the existing run to guide and marry the new section perfectly into place as you slowly jack it up.

Field checklist

Ask Foreman

Hey boss, quick learning check: What's the easiest way to line up massive ductwork pieces on a duct jack (Genie lift)? Is this the method you want used on this job, or is there a project-specific standard here?

Open Ask Foreman

Verify before acting

Use this as training guidance. The foreman, approved drawings, project specs, manufacturer installation instructions, employer safety policy, and AHJ/code requirements always control the final answer.