Printable playbook

Pre-Fire-Damper Inspection Walk

Use this before AHJ/fire damper inspection to check access, labels, blade path, and corrections.

PrintableMobile-firstCopy-ready ask

Use when

Fire, smoke, or combination damper inspection is scheduled, or ceiling/wall closure is close.

First move: walk each damper location like the inspector will ask to see it open, visible, and documented.

Walk every damper for

  1. Access panel exists, opens, and is large enough to inspect/service.
  2. UL/listing label and damper ID are visible and not covered by mastic, tape, paint, or insulation.
  3. Actuator, handle, fusible link, or control side is reachable.
  4. Blade path is clear of screws, liner, insulation, debris, and duct edges.
  5. Sleeve/retaining angles/breakaway details are visible where required.
  6. Room/grid/location is documented with photos and punch status.

Do not

Ask it clean

Fire damper inspection is coming. Do you want me to run a damper-by-damper access/label/blade-path walk and send a punch list?

Search Field RescueOpen Category 10 card

Rule: TinnerFlow helps you check and ask cleaner. It does not approve work. Drawings, specs, manufacturer instructions, code/AHJ, employer policy, site safety rules, qualified-person direction, and foreman direction always win.