TinnerFlow logoTinnerFlow™
Mistake & recovery · #146

Fabricating a replacement duct section without matching the original gauge and construction class

4th YearFabrication

When replacing duct on a retrofit or repair, identify the original gauge and construction class from the existing duct or the original as-built drawings.…

Search Field RescueAsk ForemanOpen in mistake guide

Safer field move

When replacing duct on a retrofit or repair, identify the original gauge and construction class from the existing duct or the original as-built drawings. Substituting lighter gauge or lower construction class can void warranties and fail inspection.

Ask Foreman

Can you verify this before I keep going? I’m looking at: Fabricating a replacement duct section without matching the original gauge and construction class. What’s the approved correction for this job?

Do not

Do not hide, force, cover, or “make it work” if this affects safety, access, airflow, rated assemblies, supports, equipment, or inspection. Stop and verify the approved correction.

Related mistakes

Related apprentice questions