Installing supply and return ducts that are reversed at the air handler
1st YearDuct Systems
Before connecting anything to the air handler, verify supply and return ports from the equipment nameplate and the mechanical drawing. Mark them with a pa…
TinnerFlow™1st YearDuct Systems
Before connecting anything to the air handler, verify supply and return ports from the equipment nameplate and the mechanical drawing. Mark them with a pa…
Before connecting anything to the air handler, verify supply and return ports from the equipment nameplate and the mechanical drawing. Mark them with a paint pen before routing.
Do not hide, force, cover, or “make it work” if this affects safety, access, airflow, rated assemblies, supports, equipment, or inspection. Stop and verify the approved correction.