Corrosion-Resistant Systems · Wastewater Treatment Facilities
Install wastewater fan transition
Corrosion-resistant transition — Odor-control fan
Hardware guidanceUse matching flange bolts, nuts, and washers.
Anti-seize / gallingAnti-seize removable flange hardware by approved procedure.
How to install it
- 1
Align fan and duct
- 2
support transition
- 3
install compatible gasket/flex connector
- 4
avoid fan casing loads
- 5
provide drain/cleaning access.
Quality check
- Fan remains aligned
- connection is sealed and serviceable.
Stop and verify
Stop if fan materials or connector are incompatible.