Corrosion-Resistant Systems · Wastewater Treatment Facilities

Install coated duct in wastewater building

Coated steel/PVC-coated system — Odor-control or ventilation

Hardware guidanceUse coated/compatible fasteners and caps.
Anti-seize / gallingDo not use anti-seize that attacks coating.

How to install it

  1. 1

    Inspect coating

  2. 2

    cut only with approved method

  3. 3

    seal cut edges

  4. 4

    assemble coated joints

  5. 5

    repair every holiday

  6. 6

    isolate supports.

Quality check

  • Coating remains continuous at cuts, holes, and supports.

Stop and verify

Stop if repair materials or cure conditions are unavailable.