Corrosion-Resistant Systems · Wastewater Treatment Facilities
Install coated duct in wastewater building
Coated steel/PVC-coated system — Odor-control or ventilation
Hardware guidanceUse coated/compatible fasteners and caps.
Anti-seize / gallingDo not use anti-seize that attacks coating.
How to install it
- 1
Inspect coating
- 2
cut only with approved method
- 3
seal cut edges
- 4
assemble coated joints
- 5
repair every holiday
- 6
isolate supports.
Quality check
- Coating remains continuous at cuts, holes, and supports.
Stop and verify
Stop if repair materials or cure conditions are unavailable.