Airside Controls · VAV Terminal Units

VAV with electric reheat

VAV terminal unit — Above ceiling

ConnectionAir inlet/outlet + electrical
SupportIndependent support

How to install it

  1. 1

    Hang unit

  2. 2

    connect ducts

  3. 3

    provide required upstream/downstream clearance

  4. 4

    wire heater and safeties

  5. 5

    verify airflow interlock

  6. 6

    commission.

Quality check

  • Heater access clear, airflow proven, high-limit operational

Stop and verify

Stop without proper electrical protection or minimum airflow