Airside Controls · VAV Terminal Units

Fan-powered series VAV

VAV terminal unit — Above ceiling

ConnectionPrimary inlet, discharge, return/induction air
SupportIndependent heavy support

How to install it

  1. 1

    Hang level

  2. 2

    connect primary and discharge ducts

  3. 3

    maintain induction inlet clearance

  4. 4

    connect power/controls

  5. 5

    test fan and airflow.

Quality check

  • Fan service access clear, inlet unobstructed, vibration controlled

Stop and verify

Stop if ceiling cavity cannot supply induction air